When an existing 2,000-ton cooling tower reached the end of its useful life, LJB provided civil and structural design for a new stainless steel cooling tower replacement to meet the demands of year-round operation. The project included removal and disposal of the existing cooling tower, isolation valves, pumps and auxiliary equipment. The new cooling tower has a support building to house chemical tanks and a perimeter screen wall. The design complied with Anti-Terrorism/Force Protection requirements.