This 1.7 million-square-foot distribution center was constructed with concrete tilt-up construction. The massive building encompasses 31 football fields under one roof. The building also features 36-foot clear heights and 235 dock doors, which were cast into the wall panels on site. Fast-track techniques, such as concurrent tilt-up and steel, allow for earlier occupancy. The project was also designed to be LEED Certifiable.