LJB worked with the City of Fairfield to improve both the flow of traffic and...
County Road 25A Phase III Reconstruction
This project widened 3,900 feet of County Road 25A with a center turn lane, new...
OHFA Environmental Review Records
LJB has been completing environmental assessments (called Environmental Review Records under HUD NEPA regulations) for...
Ohio Statewide Ecological Resources Surveys
LJB, as a subconsultant to EnviroScience, Inc. is providing state and/or federal threatened and endangered...
Regional MS4 Stormwater Outfall
The purpose of ODOT's MS4 inventory was to map ODOT'S storm water drainage system so...
State Route 444 Bridge Rehabilitation over Mad River
As part of a general engineering services task order contract, LJB designed the joint replacement...
State Route 741 and Innovation Drive Traffic Signal Design
LJB designed mast arm traffic signal supports that are of a style compatible with recent...
Statewide Safety Studies
Through a statewide safety study contract, LJB was asked to provide safety improvement recommendations for...
Stream Mitigation Monitoring for West Perimeter Road
LJB monitored stream mitigation and created a Mitigation Monitoring Report to document the results of...
Stroop Road Bridge
LJB was selected for this emergency project to replace the deficient, single-span prestressed concrete box...
U.S. Route 40 (North Street) Realignment
When the new Springfield Regional Medical Center opened at Plum and North Streets in downtown...
U.S. Route 40 West Broad Street Corridor Improvements
This project included multiple studies, innovative drainage treatment, and roadway and traffic signal design that...