Trinity-Weber Boulevard Industrial Park Building 1

  •  

As the structural engineer of record for this project, LJB prepared structural design documents for bidding, permitting and construction.

This project consists of a 42,160-square-foot, single-story, cross-docked, speculative warehouse with a 36-foot clear height. The design includes ground-floor office buildouts in each of the four building corners.

Building elevations include two overhead drive-in doors on each dock elevation in addition to dock-high loading doors in between, as well as a storefront entry and punched window openings at each corner programmed for a future office build-out.

Client
Frampton Construction
Location
Ladson, South Carolina

Related Projects

Grapeview Station Facility Expansion

Grapeview Station Facility Expansion

Prior to joining LJB Engineering, Grantham & Associates provided site civil…
Atlantic Packaging

Atlantic Packaging

LJB provided structural design of this 469,000-square-foot end-loaded build-to-suit manufacturing facility,…
Lehman Farms Building 2

Lehman Farms Building 2

This 1.2 million-square-foot light industrial building was originally designed by an…