Video Storm Sewer Lines at Wright-Patterson AFB

  •  

LJB performed a video survey and condition report of storm sewer lines in the West Ramp area of WPAFB. We surveyed approximately 43,200 linear feet and documented conditions and deficiencies and developed a prioritized list of the pipe sections recommended for repair with cost estimates.

Client
Wright-Patterson Air Force Base – 88th Air Base Wing
Location
Wright-Patterson AFB, Ohio

Related Projects

300 Redstone

300 Redstone

This new building serves as a central conference and nationwide collaboration…
Redstone Gateway 8000

Redstone Gateway 8000

LJB’s structural team designed this four-story, tilt-up concrete Class A office…
Smithsonian Fall Protection Services

Smithsonian Fall Protection Services

Having previously provided numerous projects for the Smithsonian Institution as a…

    * required fields