The project included furnishing and installing approximately 16,200 feet of 12-inch ductile iron water main, 22,768 feet of eight-inch through 30-inch sanitary sewer and a 440-gallon-per-minute submersible lift station with 2,100 feet of eight-inch force main
The project included setting the drainage boundaries and determining the short-term and long-term sanitary flows for the area.