Augusta Courthouse

  •    •    •  

To create an attractive and functional connection between construction of a new 120,000-square-foot courthouse and the adjacent historical Kennebec County Courthouse, our team prepared the site design, permitting, and construction documents for the 2.3-acre site. To fast-track construction, the site work was bid, awarded and commenced while the architectural plans were still in the design development phase. Creating a cohesive link between the two structures required two stories of the proposed facility to sit below grade relative to the Historic Courthouse. The difficult site topography offered opportunities for multi-level access, which assisted with the separation of various users. Retaining walls and vegetated slopes provide the elevation transition between parking areas and access points. The project’s downtown location, along with other site constraints, necessitated the provision of additional off-property parking for visitors and the public. As part of the MDEP Stormwater Permit, stormwater runoff quality was addressed through the use of StormTreat water quality units in conjunction with subsurface stormwater storage chambers.

Client
PDT Architects
Location
Augusta, ME

Related Projects

Trafton Road Interchange

Trafton Road Interchange

Our team conducted a comprehensive planning study, permitting, and conceptual design…
Pleasant Valley Road Bridge & Utilities

Pleasant Valley Road Bridge & Utilities

Our team served as the prime consultant on this multimodal road…
Rowlett Creek CLOMR & LOMR

Rowlett Creek CLOMR & LOMR

As part of the Pleasant Valley Road Bridge and Utility project,…