Pleasant Valley Road Bridge & Utilities

  •    •    •    •    •    •  

Our team served as the prime consultant on this multimodal road and bridge project that replaces a two-lane asphalt road with a four-lane divided concrete road. The design includes two 1,500-foot long bridges, two 130-foot tall City monument towers, two 60-foot tall canopy towers with overlook platforms, and 1.5 miles of trails that form part of the Six Cities Trail Plan.

We also designed related water, sanitary sewer and storm sewer improvements, as well as channel modifications that result in no increase in the Rowlett Creek floodplain elevations. In addition to civil, structural and electrical engineering, the scope of work included environmental permitting, hydraulic modeling for a CLOMR and a LOMR, topographic and property surveying, right-of-way and easement documents, as well as bidding and construction administration services.

 

Client
City of Garland, TX
Location
Garland, TX

Related Projects

Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…